Job Description
Job Title:
Engineer
Posting Start Date:
10/30/25
Department:
Structures
Job Location:
New Delhi Railway Station
Required Travel:
No
Req Id:
710
| Role Description Sheet | ||||
| SECTION I: BASIC INFORMATION | ||||
| Position Title | Structures Engineer | |||
| Grade | E1 / E2 / E3 / E4 | |||
| Location | Project Site | |||
| Business Unit | Highways | |||
| Department | Structures | |||
| Sub Department | ||||
| Reports to | Site Structures Head | |||
| Reported by | ||||
| SECTION II: PURPOSE OF THE ROLE | ||||
| Purpose of Role | To execute and supervise construction of structural components including bridges, viaducts, station structures, platforms, underpasses, ROBs, and other railway-related structures as per approved drawings, specifications, and quality standards within defined timelines and budgets. | |||
| SECTION III: JOB REQUIREMENTS | ||||
| Total Experience in Yrs. (Minimum) | 2 + years of experience in similar role preferrably in railway project. | |||
| Qualification | Diploma in Civil Engineering B.E. / B.Tech in Civil Engineering (preferred) |
|||
| Specific Certification / Additional Certifications (if Any) | Certification in Bridge Engineering, Formwork Systems, or QA/QC in Construction (preferred) | |||
| Technical/ Functional Skills Requirement | Strong understanding of structural drawings and construction sequences, Knowledge of IRC / MoRTH / IS codes applicable to structures, Hands-on experience in RCC, PSC girder works, pier and deck slab execution, Familiarity with bar bending schedules (BBS), staging systems, and shuttering methodology, Ability to maintain documentation including pour cards, cube testing records, and site logs. | |||
| Behavioral Skills Requirement | Information Seeking | Analytical Decision Making | Innovative Thinking | Initiative |
| SECTION IV: ROLES & RESPONSIBILITIES | ||||
| Responsibility | Area | Responsibility | % of Time Spent | |
| Strategic | Interpret structural drawings and design intent to ensure execution compliance, Assist in developing micro-level execution schedules aligned with master construction plans, Identify potential execution risks and communicate mitigation plans to the Structures Head. | 20% | ||
| Financial Management | Record daily executed quantities for each structure item for quantity tracking and billing support, Assist in preparation of subcontractor bills based on verified measurements, Monitor use of materials (e.g., concrete, steel, shuttering) to control wastage and cost overruns. | 20% | ||
| Operational | Execute foundation, substructure, and superstructure works including piers, abutments, PSC girders, bearings, deck slabs, and parapets, Ensure availability and deployment of formwork systems, lifting equipment, and concreting tools, Maintain site documents like pour cards, DPRs, inspection checklists, and work registers, Ensure adherence to safety protocols, barricading, and signage at work zones, Liaise with survey team for alignment and level checks before structural activities. | 50% | ||
| People Management | Supervise reinforcement, shuttering, and concrete placement as per drawing and specifications, Coordinate with QA/QC team for inspection approvals, cube testing, and quality compliance. | 10% | ||
| Total: | 100% | |||
| Any Other Job Related Details | ||||
| SECTION V: KEY INTERACTIONS | ||||
| Internal Interactions | Party Interacting With | Main Purpose of Interaction / Details | ||
| Planning & QS Team – Site | For execution schedules and quantity certifications. | |||
| QA/QC Team – Site | For approvals and compliance inspections. | |||
| Survey Team – Site | For setting out, alignment, and level verification. | |||
| External Interactions | Party Interacting with | Main Purpose of Interaction / Details | ||
| Subcontractors | To manage daily execution and resource availability. | |||
| Client/PMC/Independent Engineer | To obtain approvals for structural stages and clearances. | |||